New Products
Find What Is Cement Grouting, Concrete Grouting Contractors, Cement Injection Grouting on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.
Payment Type: | L/C |
---|---|
Incoterm: | FOB |
Delivery Time: | 30 Days |
Product description:
Permeation grouting is the most common, and oldest form, of soil grouting. The technique
consists of drilling a hole in the soil, inserting an injection pipe into the ground and then pumping
any number of liquefied materials into the problem area. How the hole is drilled, type of injection
pipe, and what material is used, are all determined by the specifics of the repair being performed.
This type of grouting is typically limited to sandy soil conditions as this type of soil allows the grout
to permeate more readily over a wider area.Epoxy Sanding Floor,Epoxy Sanding Wear-resistant Floor,
Epoxy Sanding Anti-slip Floor.
Application area:
1, need high precision installation of equipment, equipment foundation of primary grouting
and secondary grouting.
2,Anchorage of steel bars and anchors in construction and geotechnical engineering.
3,Construction reinforcement and renovation project, Liang Zhu joint, deformation joint,
4,construction joint pouring.Road, bridge, tunnel, airport and other engineering emergency repair use.
5,Anchorage construction of railway sleeper.Epoxy Orange Peel Floor.
6, column wet clad steel reinforcement used for filling angle and column gap joint.Concrete Curing Agent.
Product features:
1. The system of compensating shrinkage and gas expansion can compensate the shrinkage
and settlement of plastic slurry and ensure the close contact between grouting material and foundation.
2, no chloride-the formula does not use chlorides, thus avoiding the harm of chloride
3, free of iron-no stains due to rust or cracks due to expansion of rust
4, reliability-factory prepackaged material, which can eliminate the error caused by site mixing.
Solvent-free Color Sand Self-leveling,Solvent-free Colored Sand Floor.
Technical indicators: | |
test item | technical parameter |
Compressive strength for 1 day) | ≥15mpa |
(28 days) | ≥60mpa |
New wet density | About 2150Kg/m3 |
Expansion time | About 2 hours |
water permeability | ≤2mm |
Construction procedures:
1. The bottom plate must be clean, free of oil and other impurities, providing pressure relief
holes to ensure that all isolated places are ventilated
2. The cleaned foundation must be flooded with water a few hours before grouting. Remove
the free water and the water in the hole before pouring in
3, to achieve the required consistency, the amount of water must be accurate
4, stir until dispersed evenly, without caking,Antistatic Self-leveling Floor,Floor Coating Series.
5. After grouting is completed, all exposed areas should be maintained with curing agents or
wet sackcloth bags.
Product Categories : Grouting Material